Residential Sorts
Promotion of new-build townhouses in Gata de Gorgos
New-Build Townhouses with Private Plot in Gata de Gorgos (La Marina Alta)
In a privileged natural setting, just a few minutes from the centre of Gata de Gorgos—an area with a great tradition of agriculture and craftsmanship—Residencial Sorts is born: an exclusive development of 8 newly built townhouse homes, each with its own private plot.
Located beside the south side of the Montgó Natural Park, these homes stand out for their excellent connections to Denia, Jávea, Jesús Pobre, the La Sella golf course, and the main roads AP-7 and N-332, which link Valencia with Alicante.
The perfect balance between design, tranquillity and quality of life
Residencial Sorts combines modernity, functionality and a strategic location. Within just a few metres you’ll find essential services such as the Sports Pavilion, the municipal swimming pool and the Trenet stop, ensuring a comfortable, well-connected way of life.
Each home is laid out over two floors and features a private garden. The Mediterranean design is reflected in every detail, with contemporary finishes and a carefully considered aesthetic that brings both comfort and style.
Flexible layouts tailored to your needs
The residential offers different typologies to suit each homeowner’s preferences:
Central Homes (V3 to V6)
V4 and V6: 2 bedrooms and 2 bathrooms - €269,000
V03 and V05: 3 bedrooms and 2 bathrooms - €279,000
Corner Homes (V1, V2, V7 and V8)
V2: 3 bedrooms, 3 bathrooms, large garden, no pool option - €339,000
V7: 3 bedrooms, 3 bathrooms, option for a private pool - €349,000
V1 and V8: 3 bedrooms, 3 bathrooms, optional private pool and direct access to parking/storage room in the basement - €389,000
Optional pool (3×5 m): €25,000
Shared basement with parking spaces and optional storage rooms
The complex includes a shared basement with 12 parking spaces and storage rooms, available optionally:
Parking space: from €15,000
Storage room: €5,000
Both included in the price of homes V1 and V8
Estimated completion date: July 2027







